Capacity, sample speed, export experience and coordinated project handling help buyers move from inquiry to shipment with fewer handoff risks.
30,000+
m² Production Facility
800,000
Pieces Produced Daily
30+
Export Markets
7–15 Days
Sample Development
Technical Review
Technical Review
Product Matching & Technical Review
Share your application, capacity, closure, quantity and target market. Our team will recommend suitable bottle and jar formats based on filling requirements, appearance, production feasibility and export needs.
Application review
Capacity recommendation
Bottle and jar selection
Neck finish matching
Closure compatibility
Production feasibility review
Mould Development
Custom Development
Custom Mould Development
For distinctive shapes, capacities or brand-led packaging concepts, our team supports drawing review, technical confirmation, mould development and sample preparation.
Drawing review
Capacity and dimensions
Mould feasibility
Sample development
Mass production transition
Project Deliverables
Confirmed bottle dimensions
Mould feasibility review
Sample development
Decoration recommendation
Mass production preparation
Typical sample development cycle: 7–15 days, subject to project complexity.
Manufacturing Range
Manufacturing Range
Glass Bottle and Jar Manufacturing
Our production range supports standard and custom glass formats across beauty, fragrance, food, beverage, wellness and home applications.
Perfume bottles
Essential oil bottles
Food jars
Beverage bottles
Cream jars
Candle containers
Decorative glassware
Standard mould availability
Custom shape capability
Production consistency
Capacity flexibility
Matching closure support
Decoration and Surface Finishing
Decoration That Turns Glass into Brand Packaging
Decoration choices are reviewed with bottle shape, artwork, closure and order quantity so the finished package remains production-ready.
Color spraying
Frosting
Screen printing
Hot stamping
Ceramic firing
Carving
Lettering
Before
Plain Glass Review
Shape, neck finish and surface condition are reviewed before decoration.
After
Finished Brand Packaging
Spraying, printing, stamping and matched closures create a shelf-ready result.
Closures and Packing
Closures and Packing
Closures, Labels and Packing
Buyers can coordinate bottles, closures and packing through one supply system, helping reduce communication time and improve project consistency.
Tinplate caps
Aluminum caps
Stainless steel caps
Plastic caps
Rubber stoppers
Labels
Custom cartons
Packing inspection
Quality and Export
Quality Control from Production to Shipment
Each order is checked through a practical quality route, then prepared for export delivery with packing, marks and logistics details confirmed.
Carton mark confirmation
Loading coordination
Export documentation
Road transportation
Container delivery
Multimodal logistics support
Shipment Readiness
Confirmed carton marks
Packing inspection
Loading coordination
Export documentation
01
Raw Material Inspection
Review production inputs before forming.
02
Production Monitoring
Track shape, finish and process stability.
03
Dimensional Control
Check neck finish, capacity and key dimensions.
04
Surface Quality Check
Review appearance, decoration and visible defects.
05
Packing Inspection
Confirm cartons, marks and protection.
06
Pre-Shipment Review
Check shipment readiness before export.
Project Workflow
Service Process
A clear six-step route from requirements to delivery.
01
Requirement Review
02
Design / Sample
03
Production
04
Quality Inspection
05
Export Packing
06
Delivery Support
Industries We Support
Industries We Support
Focused packaging support for the markets we serve.
Send the basic project information first. We can then recommend whether an existing mould, modified decoration route or custom development path fits best.
01
Product application
02
Required capacity
03
Reference image or drawing
04
Closure preference
05
Estimated quantity
06
Decoration requirement
07
Delivery destination
08
Target market
FAQ
Common Questions Before Starting
Can you develop custom moulds?
Yes. We support drawing review, mould feasibility, sample preparation and mass production transition.
How long does sample development take?
Typical sample development is 7–15 days, depending on bottle shape, mould complexity and decoration requirements.
Can you provide matching caps?
Yes. Matching tinplate, aluminum, stainless steel, plastic caps and rubber stoppers can be coordinated with the bottle project.
What decoration options are available?
Color spraying, frosting, screen printing, hot stamping, ceramic firing, carving and lettering are available.
Can you support export packing?
Yes. Carton marks, packing inspection, loading coordination and export documentation can be supported.